01 / REVIEW
Describe the proposed change
Record the originally specified item and the exact alternative. List affected dimensions, profile, finish, fastener system and supporting documents separately.
02 / REVIEW
Follow dependencies
Ask the design team which details, quantities, installation requirements and maintenance documents need review. Similar appearance does not establish equivalent performance or compatibility.
03 / REVIEW
Close the record explicitly
Retain the decision, conditions and approved revision. Update procurement and receiving records so a field team can distinguish an accepted alternative from an unresolved proposal.
Trace the consequences of a changed board
A substitution can change more than species or color. Check actual section, coverage, profile, fastening interface, lengths, surface treatment and supporting evidence. Compare the exact proposed alternative with the accepted basis, field by field.
Keep the proposer’s reasons separate from the technical response. A shorter lead time or lower quote may be useful commercially, but it does not answer whether the changed connection or surface evidence is acceptable.
Reopen only the affected decisions, but find all of them
Scroll sideways to read all columns. Keyboard: focus the table and use the arrow keys.
| Change | Related review |
|---|---|
| Coverage width | Course count and perimeter layout |
| Profile interface | Fastener fit and edge conditions |
| Length assortment | Joints, support and cut schedule |
| Finish or texture | Appearance sample and surface evidence |
| Product identity | Scope of reports and installation instructions |
In a fictional boardwalk, the alternative has a similar visible face but a different side interface. The review must address the fastening package, not just approve a color sample. Keep the original and proposed details side by side.
Record acceptance, conditions or rejection through the project’s responsible review process. If the alternative is accepted, revise the procurement and receiving records. A favorable email about appearance should not be reused as approval of the whole assembly.
Build a comparison the reviewer can actually answer
Begin with the accepted product or detail revision. Beside each requirement, identify the proposed product and the specific document page that addresses it. “Equivalent hardwood” is not enough to compare a board section, fastening interface or surface report. Where the proposer has supplied no answer, write “not supplied” instead of copying the accepted value into the proposed column.
Scroll sideways to read all columns. Keyboard: focus the table and use the arrow keys.
| Comparison field | Accepted basis | Proposed alternative / evidence needed |
|---|---|---|
| Product identity | Manufacturer, product and revision | Exact proposed identity; identify any mixed product package |
| Board and edge geometry | Drawing with actual section and interface | Proposed drawing; mark each changed or unresolved feature |
| Surface evidence | Report and stated test conditions | Report tied to the proposed surface; explain scope differences |
| Connections and transitions | Accepted fastening and junction details | Affected details and system-specific installation documents |
| Supply and replacements | Lengths, quantities and spare-stock basis | Changed assortment, exceptions and replacement availability |
| Owner documents | Accepted inspection and maintenance information | Revised instructions and records needed for handover |
A report for a different finish, surface or product is not automatically evidence for the proposed item. Record the mismatch as a review question. Use the surface evidence guide to keep the report’s scope visible. The procurement worksheet can hold the required evidence and open questions; entering a note there does not record project approval.
Worked review: the boards arrive in shorter lengths
In a fictional project, a supplier proposes the same named board product in a different length assortment. The proposal says the total linear quantity is unchanged. That answers one purchasing question, but it leaves the joint layout unresolved: more short pieces can change where ends occur, how many cuts are needed and which transitions need a revised detail.
The reviewer requests the proposed length schedule and a marked layout showing the affected joints. The responsible design team reviews support and connection implications; the owner reviews replacement-stock and staging implications. The quantity planner can then be rerun with the accepted inputs. It cannot decide whether an unsupported joint or a changed connection is acceptable.
Keep the outcome specific. “Length assortment accepted subject to layout revision B” is a conditional record, not permission to disregard the condition. If revision B has not been supplied or reviewed, show that item as open. Do not turn the example into a standard joint spacing, fastening schedule or allowance.
Separate the review decision from release to purchase
Use the project’s own approval process and responsible reviewers. A useful record distinguishes the proposal received, technical response, unresolved conditions and the version released for procurement. Approval of a color sample, confirmation of stock or acceptance of a price should retain its limited scope.
- Record who made each decision, its date and the exact proposal revision.
- List conditions individually, with the evidence needed to close each one.
- Identify drawings, quantities, fasteners, mockups and owner records affected by the change.
- Before release, confirm that the purchasing description matches the accepted revision.
- Give receiving staff the accepted product identity and the differences they must check.
- Retain the original basis, proposal, decision and superseded documents in the closeout record.
If an unresolved alternative arrives on site, delivery alone does not close the review. Keep its identity and status distinct from accepted stock and follow the project’s receiving process. The receiving checks and closeout records connect the review decision to the material actually supplied.
Apply the comparison
Keep the accepted basis beside the proposal
Record document identifiers and page references, not confidential document contents. Export before leaving; reloading clears these entries. The worksheet stores no source files and makes no approval decision.
6 of 6 comparison areas still have missing entries or an unrecorded assessment.
01 / Product identityEntries missing
Name the exact products and revisions. A species name alone does not identify the supplied package.
02 / Board and edge geometryEntries missing
Compare actual section, coverage and interface drawings. Leave missing dimensions unresolved.
03 / Surface evidenceEntries missing
Identify the report, tested surface and conditions. Appearance is not a substitute for a relevant report.
04 / Connections and transitionsEntries missing
Identify affected fasteners, support interfaces, edges and route transitions.
05 / Supply and replacementsEntries missing
Compare length assortment, quantities, spare stock and replacement availability.
06 / Owner documentsEntries missing
Identify care instructions, accepted revisions and receiving or closeout records affected.
“Entries recorded” means fields contain text. It does not establish equivalence, acceptance or release to purchase. Keep missing evidence and unresolved conditions open in the project record.
A public-route planning scenario
Concept example: an alternative board width changes the surface layout and quantity. The planner is rerun using approved dimensions only after the project team resolves the system review.
Use the result
Keep the completed review with the relevant project record. Assign unresolved items before relying on a conclusion. If the material, condition or document changes, revisit the affected questions.