01 / REVIEW

Write the requirement

Describe the necessary physical, functional or performance characteristic and why it matters to this project. Ask the procurement authority to confirm the permitted solicitation approach. Federal references are not automatically local procurement rules.

02 / REVIEW

Ask for evidence

For each requirement, identify an acceptable evidence type and the evaluator. Keep unknown or missing responses visible. Avoid filling blanks with assumed species properties, generic certifications or marketing language.

03 / REVIEW

Record exceptions

Show deviations and substitutions beside the original requirement. A lower material price may not represent equivalent scope if lengths, machining, delivery arrangements or submittals differ.

Purchase a defined surface package

A boardwalk material schedule should connect each line to the accepted profile, appearance basis and intended location. Keep field boards, borders, special pieces and accessories separate where their requirements differ. A single total in linear feet can hide those distinctions.

Give bidders the same document revisions. List which submittals are required, when they are needed and who reviews them. A low price against an older drawing is not directly comparable with an offer against the current design.

Use a procurement matrix

Scroll sideways to read all columns. Keyboard: focus the table and use the arrow keys.

Use a procurement matrix
Line itemIdentity to preserveEvidence or decision
Field boardSpecies/product and profile revisionAccepted supplied configuration
Special edge pieceLocation and machining detailAttachment and interface review
Fastening packageExact system and accessory referencesConnection documentation
FinishProduct and accepted samplePreparation and application scope
Replacement stockSpecified identity and quantity basisStorage and future matching plan

For a fictional project, one supplier includes special border pieces while another quotes only field decking. Show the difference as scope, not as an unexplained difference in unit price. Ask for the missing items before recommending an award.

Carry accepted deviations into the receiving record. An approved alternative should have an identifiable revision so the delivery team can distinguish it from an unreviewed substitution.

Send one question that each bidder can answer

A procurement matrix becomes more useful when each row contains one requirement. Split “complete high-quality hardwood package” into the board identity, actual section, machining, accessory system, finish scope and delivery requirements. Broad wording makes a response difficult to compare even when every bidder checks the same box.

For each row, retain the issued drawing or specification reference, the bidder’s response, the evidence reference and the exception. Keep evaluation status separate from commercial status. An offer can be received and priced while a required technical response remains outstanding.

Scroll sideways to read all columns. Keyboard: focus the table and use the arrow keys.

Send one question that each bidder can answer
Fictional lineRequired basisBid responseStatus
Field profileDrawing P-03, issued revisionDifferent groove proposedSubstitution review required
Border machiningDetail E-02Excluded from quoted priceScope clarification required
Accessory packageExact system identified in submittalProduct identifier not suppliedEvidence missing
Phased deliveryOwner’s stated segment sequenceIncluded, dates to be confirmedCommercial condition still open

Close a clarification without losing its history

When a bidder replies, attach the response to the original question and record which revision it replaces. A revised total without the revised scope can leave the evaluator unable to explain why the price changed. Keep the accepted package and its exclusions together.

Before ordering, reconcile the selected offer with the issued material schedule and the recorded deviations. Identify who can authorize a substitution and who checks receiving documents. The supplier’s confirmation of availability is a commercial input; it is not approval of a changed profile or installation detail.

Use the procurement worksheet to organize the package, and the substitution record when an offered change needs its own decision. Keep the actual source documents available outside the summary. A report filename or checked field should never be treated as proof that the underlying evidence was supplied.

A public-route planning scenario

Concept example: one offer excludes machining and another includes it. The comparison keeps those scope differences visible rather than presenting a single misleading unit-price winner.

Use the result

Keep the completed review with the relevant project record. Assign unresolved items before relying on a conclusion. If the material, condition or document changes, revisit the affected questions.

Boardwalk planner
Technical references

General background for the subject. Project worksheets and fictional situations are original review aids, not official agency forms.

Access Board: floor and ground surfaces

Access Board: federal outdoor developed areas

Federal procurement reference: FAR 11.104